Mackelvie Warehouse & Showroom

Sector

Industrial, Warehouse, Commercial Renovation

Location

Grey Lynn, Auckland

Established

2025

Architect

CJ Architects Team

Builder

Gibson O’Connor Construction

Other consultants

Sentinel Planning (planner), EQSTRUC (structural), Nelligan (fire), HDNZ Ltd (hydraulic), ECS Ltd (electrical), 22 Degrees (mechanical), Symetrix (facade), BQH (quantity surveyor)

Materials

Structure: Concrete masonry, structural steel, timber framing

Floor: Ground and Polished Concrete

Cladding: Alucobond Plus ACP Cladding Systems  and JH HardieFlex Sheet

Roofing: Roofing Industries Dri-Dlad Profiled Metal Roofing and Clear Topglass GC Ultra-Safe Roofing

Gutters: Nuraply TPO Roof & Deck Membrane

Exterior Windows and Doors:  APL Shopfront and Commercial Aluminium

Interior Windows and Doors: ASL Glass Partitioning System

Window Control Systems: WCS Window & Ventilation Control

Bathroom Waterproofing: Bostik Tiling & Waterproofing Solutions

Insulation: Autex Greenstuf

Bathroom Linings: Seratone by Laminex

Vinyl Flooring: Jacobsen

Suspended Ceiling: Asona Suspended Ceiling Tile System and Rondo Ceiling Grid

Painting: Resene

Our client's brief was to modernise the existing two warehouse buildings, including service rooms, office and showroom areas.  The original buildings, built in 1960 and 1980, were run down and in need of a structural upgrade.  Mezzanine floors were removed and the original roof line returned to it’s original form. 

A new façade was requested by the client, to refresh the building’s image and align it with the current contemporary vibe in the street. The local architecture is sophisticated, pedestrian friendly, full of mixed-use and refurbished industrial spaces.

09-479-3120

09-479-3120

IMG_6363.avif

The building now includes modern office spaces, with a connected, welcoming showroom area.  These spaces have large glass sliding doors and windows, which allow a visible and physical connection between them and the street.  Other areas include new bathroom and kitchen facilities, re-vamped warehouse spaces, with new roofs and clerestory windows, providing daylight and ventilation.

The adaptive reuse of the existing two buildings, has repurposed the existing structures for a new function.  Rather than demolishing the buildings, the renovation has brought new life into outdated spaces.  Adaptive reuse drastically reduces embodied carbon emissions, and preserves the architectural and cultural heritage of the community.